Alliance Laundry Systems SX18BVPA7 Specifications Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 59
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
25
9002106
Machine Foundation
Thoroughness of detail must be stressed with all
foundation work to ensure a stable unit installation,
eliminating possibilities of excessive vibration during
extract.
The machine must be placed on a smooth level surface
so that the entire base of the machine is supported and
rests on the mounting surface.
The standard installation does not require anchoring
unless mandated by state or local codes.
Static and dynamic loads on the floor or foundation are
shown in Table 2 .
Table 2 can be used as a reference when designing
floors and foundations.
If installing a foundation and pad, prepare a form for
the above-ground portion of the foundation. Verify
that the top of the foundation is level. The height of the
foundation and pad must not exceed 8 inches
(203 mm) above the existing floor.
IMPORTANT: Mounting bolts MUST be used for
installation on the 18, 25 and 35 pound models
equipped with steam heat and models installed on
metal base frames. Refer to Mounting Bolt
Installation.
Ensure that the machine is installed on a
level floor of sufficient strength and that
the recommended clearances for
inspection and maintenance are provided.
Never allow the inspection and
maintenance space to be blocked.
W488
CAUTION
Floor Load Data
Model 1825303335405575100135165200
Kinetic Energy of the
Cylinder, (N/m)
1386 1730 2592 2736 3240 4105 6640 12404 18361 23257 29581 29581
Dynamic Bottom
Load, (N/Hz)
700/16 750/16 1000/16 1200/16 1200/16 1200/16 1700/15 2000/15 2960/13 3900/13 4960/13 6100/13
Table 2
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 58 59

Comments to this Manuals

No comments